• Knock_Knock_Lemmy_In@lemmy.world
    link
    fedilink
    English
    arrow-up
    1
    ·
    1 month ago

    You don’t need much concrete for wind, and only a single slab for the solar transformer.

    The problem is the assumption that the datacenter must be running at 100% power 24/7